Experience with Past and Present Clients

From the company’s inception and formation Wallace Interior Solutions has been very busy and has been fortunate to carry out some very prestigious projects including:

Tesco Net’s internet shopping data suite

A self contained data suite constructed from a sublet shell in an existing data centre.
Works included:  new computer floor, coordinated layered network of cable trays and data cable basket, installation of a new power infrastructure and presentation of dual fed UPS backed power supply outlets, new clean earth system. Installation of three Denco down flow units. BMS system monitoring environmental conditions, safety systems and machinery operation.  Vesda system, fire detection and a FM200 fire extinguishing system.
We succeeded in providing an air sealed, clean controlled environment that passed its integrity test on the first attempt, the client signed off the room on the planned handover date with no snagging or outstanding items.  

Tiscali Uk  Main reception rebrand, London

A simple but very effective make over of the main reception to update the look to comply with the new corporate brand identity including feature flat screen wall and new colours.

Pipex,  Head Office, Stoke Mandeville  

A reorganisation of the floor plate to allow for increased occupancy, strip out of redundant cellular offices and relocation of offices, a new break out area and T point, new reception and reception office, new floor finishes and decorations, new entrance lobby and security walls and doors, Corporate signage.

Tiscali TV Post production Facility, London

The strip out of an existing office space back to the structure, creation of cellurised acoustic enclosures, new power infrastructure, equipment cabling back bone, basement comms room construction, hi quality finishes, new editing furniture, the fit out of a recording studio, voice over facility and five editing suites, full equipment installation.

Tiscali Uk Data Suites, Main Data Centre

The construction and fit out of 2nr data suites, to be used as a fully serviced, lettable space.

The strip out of existing office space back to the structural shell and creating an airtight, dust free enclosure, new computer floor, coordinated layered network of cable trays and data cable basket, installation of a new power infrastructure including main links to Engineering block, presentation of dual fed UPS backed power supply outlets, new clean earth system. Installation of Denco down flow units. BMS system monitoring environmental conditions, safety systems and machinery operation.  Vesda system, fire detection and a FM200 fire extinguishing system.

Tiscali TV Network Operations Centre

The strip out of existing office space, a new under floor power distribution system and cat 5e data cabling. Split unit cooling system installation, LG7 lighting scheme, Main equipment cabling backbone and link to equipment room,  New full height glazed offices and meeting rooms, floor finishes, decorations, new desk system, equipment installation to data suite, monitoring equipment installation and control centre desk installation to main room.